A strategically located facility in Veliko Tarnovo is available for sale. Discover the benefits to position your business for success.

Modern

Production Facility in

FOR SALE

A strategically located facility in Veliko Tarnovo is available for sale. Discover the benefits to position your business for success.

Veliko Tarnovo

Warehouse and production area

Cold storage and distribution

The northeast section (administrative) of the building is a two-story arrangement. The first floor of this section has an approximate area of 775 sq. m. This multi-functional area centralizes administrative, meeting, and initial production processes, while also including a staff canteen on the northeast side of the building for employee amenities. The upper floor specifically houses the lobby area, various office spaces, meeting rooms, sanitary facilities, and the ingredient mixing production area.

Administrative section

Property structure

VIEW SPECIFICATION

  • Total Surface: 2,525 sq. m
  • Number of Cold Chamber Units: 5
  • Total Space of Cold Chambers: 1,632 sq.m.
  • Total Pallet Capacity (in five chambers): 1,750 pallets
  • Operating Temperature Range: -10°C to -25°C

VIEW SPECIFICATION

  • Total Surface: 2,950 sq. m
  • Clear height: 7m
  • Total Warehouse Pallet Capacity: 580 pallets

VIEW SPECIFICATION

  • Office space surface: 775 sq. m
  • Clear height: 3.2 m 

This area is designed to support efficient production workflows. It includes warehose areas for storing raw materials and packaging supplies, directly connected to the main production hall. The warehouse features a pallet racking system for organized and streamlined storage and retrieval. In addition, the site offers maintenance rooms, versatile spaces for various production needs, and an adjacent area next to cold chambers, enhancing operational flexibility.

The cold storage is equipped with a comprehensive pallet racking system, which extends into all five cold chamber units, allowing for efficient and organized storage of temperature-sensitive products. The cooling chambers are managed by two freon compressor units, and uniquely, the heat generated by these units is recuperated and utilized to warm the office and staff areas, contributing to energy efficiency.

6 Loading docks

Loading elevator

Fire Alarm

Water source from
public system

110 km

227 km

214 km

To Sofia city center (3 hr 4 min)

To Ruse (1 hr 35 min)

To Plovdiv
(2 hr 56 min)

Strategic Location

Gallery

Click the first image to view the full gallery.

Contact our team

Dimitar Hristov
Associate Director
Industrial & Logistics

dimitar.hristov@cbre.com
Tel. +359 882 355 820
If you are interested in production pacility opportunity in Veliko Tarnovo, please reach out to our dedicated team.

Irena Karamfilova
Senior Consultant
Industrial & Logistics

irena.karamfilova@cbre.com
Tel. +359 882 350 795